Stardust Power is developing a large central refinery in a phased approach

The first phase is the construction of an up to 25,000 ton per annum production line. The second phase is to add a second production line of up to 25,000 tons per annum to create a total capacity of up to 50,000 tons per annum.

The refinery is being optimized for multiple lithium brine inputs.

The facility is being designed to accept a diverse matrix of acceptable input composition.

The facility can pretreat feedstock as necessary. It can blend different sources to produce a consistent feedstock. Also, it will have the ability to accept concentrated feedstock and can dilute the feedstock to acceptable levels. By creating the engineering for multiple inputs, we may aggregate sources of lithium.